We deal with many types of construction projects such as buildings, infrastructure, and industrial. Building constructions are divided into residential and non-residential. With any type of construction project, skilled surveyors has the ability to survey all that is needed to have accurate results.

Total Surveying Solutions provide initial set up surveys that will accurately determine boundaries and benchmarks for the expansion as well as bulk earthworks surveys during car park excavation. And once the excavation is completed, we will provide pre-pour and post-pour surveys for formwork and concrete floor slabs together with external surveys for concrete upstands.

Summus Apartment

construction summus apartment
  • ClientBrady Group
  • DurationDecember 2016 to current (expected completion 2019)
  • LocationMaribyrnong, VIC 3032

One of Maribyrnong’s tallest towers, Summus includes a combined hotel and apartment building which will offer privileged views across Melbourne’s city skyline.

Project includes:

Building A – 10 townhouses, 2 storeys
Building B – 14 storeys, 132 apartments &
Building C – 7 storeys, 45 Quest serviced apartments.

TSS Total Surveying Solutions are providing surveys for bulk earthworks right through to the completion of construction.

TSS Surveyors are providing set out surveys for basement excavation, cranes, hoists and concrete grids, as well as monitoring surveys and monthly compliance certification.

Once construction is completed, TSS will provide final as-built surveys of all buildings and structures for the issue of the Construction Certificate.

Centrale North Ryde

construction centrale north ryde
  • ClientGanellen
  • DurationDecember 2015 current (expected completion in 2017)
  • LocationNorth Ryde, NSW 2113

Centrale is located 13km from Sydney CBD and 1 train stop from Chatswood. It offers more than just premium apartment living, it also offers a community lifestyle with cafes, open plazas and a residents only landscaped podium garden and barbeque area.

Centrale is made up of 4 buildings with 48 residential apartments.

TSS Total Surveying Solutions are providing initial site set up surveys to determine boundaries and benchmarks, as well as bulk earthworks surveys during car park excavation.

During construction, TSS will provide pre-pour and post-pour surveys for formwork and concrete floor slabs and external surveys for concrete upstands.

On completion of construction, TSS will supply as-built surveys for DA certification and final surveys for Occupation Certification.

Clemton Park Village

construction clemton park
  • ClientParkview Group Australia
  • DurationApril 2015 to current (expected completion 2017)
  • LocationCampsie, NSW 2194

Located on the former Sunbeam factory site in Campsie, Clemton Park Village is a 76,000sqm mixed used development comprising of The Piazza shopping complex, Outdoor Communal Garden, Retail space, common park facilities and 700 residential apartments.

TSS Total Surveying Solutions are providing initial site set up surveys to determine boundaries, easements and benchmarks, as well as bulk earthworks surveys during basement excavation.

Once excavation is completed, TSS will provide pre-pour and post-pour surveys for formwork and concrete floor slabs and external surveys for concrete upstands.

On completion of construction, TSS will supply as-built surveys and final certification for submission of Occupation Certificate.

Corporate Connect Centre, Mascot

construction corporate connect centre
  • ClientTaylor Constructions Group
  • DurationNovember 2014 to current (expected completion in 2017)
  • LocationMascot, NSW 2020

All Stages 1 & 2.
Located minutes away from the airport, Connect Corporate Centre consists of a new Commercial Office Precinct featuring 40,515sqm of office space across 3 architecturally designed buildings. There will be a Ground Floor Retail hub, onsite secure parking and the 5star Pullman Hotel with restaurant, bar and conference facilities

TSS Total Surveying Solutions are providing initial site set up surveys to determine boundaries and benchmarks, as well as bulk earthworks surveys during car park excavation.

During construction, TSS will provide pre-pour and post-pour surveys for formwork and concrete floor slabs and external surveys for concrete upstands.

On completion of construction, TSS will supply as-built surveys for DA certification and final surveys for Occupation Certification.

Morton Precinct Promenade, Parramatta

construction morton precinct
  • ClientProbuild Constructions
  • DurationAugust 2014 to current (expected completion 2017)
  • LocationParramatta, NSW 2150

All Stages 1, 2 & 3.
Located on Parramatta River foreshore, the Morton Precinct Promenade comprises of 11 mixed development apartment style buildings, with ground floor retail/office space and 782 residential apartments. The Promenade will be complete with a foreshore
park, common parking facilities, landscaped podium level and landscaped open space.

TSS Total Surveying Solutions are providing bulk earthwork surveys during basement excavation, initial site set out surveys to determine boundaries and benchmarks, detail surveys of landscaped areas and survey grid lines for finished concrete slabs on each floor.

Once construction is completed, TSS are able to provide surveys for work as executed on roads, OSD tanks, Outdoor areas, Basement Pump drainage systems, as well as the surveys of the completed buildings and boundaries.

Blacktown Hospital

construction blacktown hospital
  • Client
  • Duration
  • Location

Stage 1 of the Blacktown Hospital expansion project consisted of an upgraded Sterilising Department, internal refurbishment, new Multi Storey Car Park, several new hospital units and a new Digital Surgery Theatre.

TSS Total Surveying Solutions are providing initial site set up surveys to determine boundaries and benchmarks for the expansion, as well as bulk earthworks surveys during car park excavation.

Once excavation is completed, TSS will provide pre-pour and post-pour surveys for formwork and concrete floor slabs and external surveys for concrete upstands.

On completion of construction, TSS will supply as-built surveys for DA certification.