Civil work projects include streets, bridges, utilities, roads, water distribution, wastewater conveyance facilities, storm drainage, flood control projects, transit projects, airport runways, taxi ways. These are just some of the civil work projects that TSS cover which is done professionally, expertly, and accurately.

TSS Surveyors provides set out surveys for all earthworks, bridges, pavements, services, and barriers while complying with RMS G71 requirements. Once the construction is completed, Total Surveying Solutions provides as-built surveys for bridges, pavements, services and roadways of which processes all detail surveys to RMS specifications then will be supplied models in 3D.

Jordan Springs East

civil works jordan spring east
  • ClientMenai Civil Contractors
  • DurationMarch 2016 - current
  • Location Jordan Springs NSW 2150

Jordan Springs community plans consist of 1,300 new residential lots together with commercial/retail facilities, parks and open space.

Once the scale of the project was fully understood it wasn’t long before a surveyor was needed on site full time. We assisted in the design of deep excavations for Menai Civil to achieve safe, efficient and cost effective Benched Earthwork Excavation up to 11 m deep. We are also providing accurate regular Alignment and Setup Surveys for the underground Boring System achieving highly accurate results over long distances underground.

TSS has been responsible for all site set-outs to date and for all subcontracting crews – stormwater, sewer, culverts, pavements, kerbs, retaining walls, underground services. We are also providing the client with ongoing GPS models, volumes/reports, calc’s of design info.

EW1, EW2 and EW4 were the first earthwork sections to be completed towards the end of 2016. Along with these was the construction of a 1.5km Connector Road linking the subdivision back to Jordan Springs.

TSS continue to push forward with aiding the client with Stormwater Redesigns where issues occur with existing Services and where the Design has not covered an area correctly, complete Design of the Main Bridge Abutment Earthworks (Design & Construct) at the client’s request, UAV Flights for Particular Earthwork Volumes, Imagery and Checks. As well as regular Drafting and Calculating. EW3 is currently under construction and due for completion mid 2017.

Terrigal Intersection Upgrade

civil works terrigal intersection upgrade
  • ClientBMB Construction
  • DurationJune 2014 to February 2016
  • LocationTerrigal NSW

The project included the widening of Terrigal Drive between Duffys Road and Charles Kay Drive to provide two through lanes in each direction and additional left and right turn lanes out of Charles Kay Drive, as well as providing a shared pedestrian and cycle path and pedestrian traffic lights.

TSS Total Surveying Solutions provided survey for bulk earthworks right through to the completion of all civil works.

TSS Surveyors provided set out surveys for earthworks, pavements, services and barriers while complying with RMS G71 requirements.

Once construction was completed, TSS provided as-built surveys for pavements, services and roadways and processed all detail surveys to RMS specifications then supplied models in 2D.